Small drilling rig 20m concrete foundation engineering rig
Payment Type: | L/C,T/T |
---|---|
Incoterm: | FOB,CIF |
Min. Order: | 1 Piece/Pieces |
Delivery Time: | 14-21 Days |
Basic Info
Model No.: DR-80
Type: Drill
Pressure Pile Driver Type: Hydraulic Pile Driver
Power Source: Diesel
Certification: SGS, CE, ISO 9001:2008
Condition: New
Additional Info
Brand: Dingli
Transportation: Ocean,Land
Place of Origin: China
Supply Ability: 10 units per month
Certificate: ISO CQC CE SGS
Port: Qingdao,Tianjin,Shanghai
Product Description
20M Manual Diesel Ground Drilling Rig Machine DR-80 adopts a high-quality crawler-type chassis, with a small turning radius and a large torque force. The plunger pump is installed in the hydraulic system, with a large flow rate, low noise, and a long life. Fast speed and high efficiency. Widely used in urban high-rise buildings, railways, highways, bridges, airports, ports and other pile foundation projects for bored pile construction. It has a wide range of applications, high construction efficiency, stable performance, good service, environmental protection and energy saving. Various performance display and safety monitoring alarm devices, transitions, and easy displacement. The company has dozens of engineers, has a complete, scientific and quality management system, and has passed the certification of quality and technology supervision system. The company has a large number of advanced and professional production equipment and testing instruments, and its product parts are processed by advanced CNC machine tools. The company will "survive by quality, develop by service" wholeheartedly welcome new and old customers.
Product Type
DR-80
Chassis length.(mm)
3700
Track width.(mm)
600
Machine weight.(t)
22-24
Maximum drilling depth.(m)
20
drilling diameter.(mm)
450-1600
Engine brand
Yuchai/Weichai/Cummins(Optional)
Engine rated power.(KW/rpm)
110KW-151KW
Maximum torque of power head.(KN.m)
80
Power head speed.(rpm)
10-50
Maximum working pressure of hydraulic system main pump.(MPa)
30
Maximum working pressure of hydraulic system auxiliary pump.(MPa)
12
Maximum bow rate of the main pump hydraulic system.(L/min)
63*2(Optional)
Maximum bow rate of the auxiliary pump hydraulic system.(L/min)
16
Maximum pressure of the pressurization system.(KN)
100
Maximum lifting force of the pressurization system.(KN)
80
Maximum travel pressure system.(mm)
3000
Maximum lifting force of the main winch.(KN)
120
Maximum pull-up speed of the main winch. (m/min)
50
Maximum lifting force of the auxiliary winch.(KN)
15
Maximum pull-up speed of the auxiliary winch.(m/min)
50
Left and right inclination angle of drilling mast(°)
±5
Forward and backward inclination angle of the drilling mast. (°)
5/90
Maximum driving speed(KM/h)
1.5
Maximum climbing angle.(°)
25
Maximum Driving torque.(KN.m)
40000
Overall width of working state.(mm)
2600
Overall length of transport status.(mm)
11500
Overall width of transport status.(mm)
2600
Overall height of transport status.(mm)
3350
Drill rod type
Machine Lock
Drill rod whether to provide custom
Yes
drill tools
500-1600mm drilling bit、Drilling Barrel、Coring drill、Reaming drilling bit
CONTACT US
SHANDONG YAHE CONSTRUCTION MACHINERY CO., LTD
Address: 500 METER EAST OF WULITUM ROUNDABOUT, JINGHE WEST ROAD TENGZHOU, SHANDONG PROVINCE, CHINA.,Zaozhuang,Shandong
Contact Person: Gloria
Phone:86-0632-15866237600
Fax:
© 2019 CHINA WAY. All Rights Reserved.SHANDONG YAHE CONSTRUCTION MACHINERY CO., LTD,Inc. All Rights Reserved. Sitemap. Sitemap.html